On-going Projects

1. All Civil Engineering Works, supply of 50mm machine crushed stone ballast, complete track work including linking of track in connection with gauge conversion work between Nadiad-Petlad (37.26km) (Vadodara Division, Central Railway)
On-going
3. Supply, Installation, testing & Commissioning of Track Works of Standard Gauge in elevated as well as in underground section & Poonamalle Depot in corridor-4 (Chennai Metro Railway Limited)
On-Going
5. Construction of bridge (Major, Minor and RUBs)form DFC ch:151.000 to DFC Ch: 162.900-DFC-Dahanu, Mumbai
On-going
7. Construction of Limited Use Subway In lieu of Level Crossing No. 73,114 & 118.
On- Going
2. All Civil Engineering Works, supply of 50mm machine crushed stone ballast, complete track work including linking of track in connection with gauge conversion work between Petlad-Bhadran (22.50km) (Vadodara Division, Central Railway)
On-going
4. Construction of Roadbed, Major/Minor Bridges, Service Building, Staff Quarters, Platform, Passenger Amenities from Bhalwani to Washmibe in connection with Doubling (Solapur Division, Central Railway).
On-going
6. Construction of Limited Use Subway In lieu of Level Crossing No. 9, 10 & 12 in connection with Salem-Karur Section (Salem Division, Southern Railway)
On-going

Completed Projects

1. Construction of Road Over Bridge In lieu of Level Crossing No. 08 in Dindigul-Pollachi Section (Southern Railway)
Completed
3. Construction of Road Over Bridge in lieu of Level Crossing No 55, 80, 123 in Villupuram-Katpadi Section (Southern Railway)
Completed
5. Construction of Road Over Bridge in lieu of Level crossing No. 02 with Composite Girder in Pattabiram (Southern Railway)
Completed
7. Construction of Foot Over bridge at Alandur CMRL Metro Station across GST Road. (Chennai Metro Rail Limited)
Completed
2. Construction of Subway in lieu of Level crossing No. 15, 17,21,24 in Karur-Dindigul Section (Southern Railway).
Completed
4. Construction of Subway in lieu of Level crossing No. 14,16,26 in Karur-Dindigul Section (Southern Railway).
Completed
6. Construction of Road Over Bridge In lieu of Level Crossing No. 29 between Kanchipuram East and Kanchipuram Station (Southern Railway)
Completed

Join our energetic team today!

If you feel like you have the passion as well as the perseverance to create an
impact and contribute to the development of the country, then Mana & Kias
is the place to be for building your career.

Scroll to Top